Three high-speed doors for a cold storage warehouse – efficient mobilization and the optimal solution in record time

The projects that involve us from the consultancy phase all the way to installation are the ones that best represent who we are. They allow us to control the entire process – from identifying the client’s real need, to commissioning a solution perfectly adapted to it.

A recent example is the implementation of an access solution for a cold storage warehouse within a logistics center located near Bucharest.

A clear need, a fast response

The client needed high-speed doors, capable of minimizing air exchange between the interior and exterior as much as possible, in order to keep the temperature constant in the areas where food products are stored.

Our response: three high-speed doors measuring 3000 x 3200 mm, with opening and closing speeds tailored to the demands of a high-traffic logistics space.

Design, delivery, and installation – in one integrated workflow

The KADRA Projects team analyzed the technical requirements and proposed the optimal solution, while the KADRA Service team installed, adjusted, and tested the systems in just 12 hours of sustained work.

The installation was completed quickly and with great attention to detail, to ensure:

  • Reliable, quiet operation
  • Effective sealing of the space
  • Quick integration into the warehouse’s operational flow

The result: a functional, safe, and efficient cold storage space

This project demonstrates the efficiency and coordination between our departments – from quoting and consultancy to installation and inspection.

Team mobilization makes the difference, and when we work together, we can deliver quality results in record time.